Project Highlight: Student Hostel – Kumudini Hospital
Client: Sheltech Engineering
Location: Kumudini Hospital Campus
Project Type: Student Hostel Foundation
Total Piles: 520 Nos
Equipment Used: Changhee 320 Ton Hydraulic Static Pile Driving Machine
Project Overview:
AE Construction Ltd was entrusted with the piling work for the Student Hostel project at Kumudini Hospital, a development led by Sheltech Engineering. The scope involved the installation of 520 pre-cast concrete piles, ensuring a solid foundation for the multi-storey structure. We deployed our Changhee 320 Ton HSPD Machine to carry out vibration-free and precise pile driving, adhering to tight site constraints and high quality standards. The project was executed with a focus on safety, accuracy, and minimal disruption to the surrounding hospital environment.