Pile Integrity Test (PIT)

Non-Destructive Testing for Sound Foundations

At AE Construction Ltd, we provide Pile Integrity Testing (PIT) to assess the condition and continuity of installed piles. This quick, cost-effective, and non-destructive method ensures your foundation piles are defect-free and built to last—without the need for excavation or intrusive inspection.


What is Pile Integrity Testing?

Pile Integrity Testing is a low-strain dynamic test that evaluates the structural soundness, length, and continuity of concrete piles. It helps detect internal defects such as:

  • Cracks

  • Voids

  • Honeycombing

  • Necking

  • Changes in pile cross-section

The test is also referred to as low-strain impact integrity testing and is performed using handheld equipment that delivers a light tap to the pile head and analyzes the resulting wave reflection.


When is PIT Required?

  • Quality assurance during or after pile installation

  • Testing old or buried foundations

  • Verifying pile integrity before structural load is applied

  • Third-party verification for consultants and clients

  • Identifying construction errors such as cold joints or segregation

  • Post-installation compliance with specifications and standards

We conduct PIT in accordance with ASTM D5882, ensuring international-standard accuracy and reliability.


Our PIT Process

  1. Surface Preparation
    The pile head is cleaned, leveled, and sometimes slightly chipped to ensure a solid testing surface.

  2. Sensor Placement
    An accelerometer is attached to the pile head, and a handheld hammer delivers light impact taps.

  3. Waveform Measurement
    The software captures the reflected stress waves, which indicate changes in pile stiffness and geometry.

  4. Analysis & Interpretation
    Our engineers analyze wave signatures to detect anomalies and estimate pile length.

  5. Report Delivery
    A clear and detailed report is provided with waveform plots, interpretations, and engineering conclusions.


Benefits of Pile Integrity Testing

  • Fast, portable testing—ideal for tight or remote sites

  • Non-destructive and causes no damage to the pile

  • ✅ Identifies hidden flaws early before problems arise

  • ✅ Can test multiple piles per day

  • ✅ Enhances quality control and project credibility

  • ✅ Validates installation techniques and workmanship


What Can PIT Detect?

  • Major cracks or voids

  • Discontinuities or changes in cross-section

  • Inadequate pile length

  • Poor pile-to-soil contact

  • Integrity of cast-in-situ or precast piles

This method is ideal for both bored cast-in-place piles and precast driven piles.


Why Choose AE Construction Ltd for PIT?

  • ✔ Certified testing team and calibrated equipment

  • ✔ Fast mobilization across Bangladesh

  • ✔ Coordination with your construction or piling schedule

  • ✔ Reports accepted by engineers, consultants, and authorities

  • ✔ Experienced in testing 1000+ piles across diverse soil conditions

Whether for one pile or an entire project scope, we ensure testing is fast, accurate, and non-intrusive.


Applicable Projects

  • High-rise buildings

  • Bridges and flyovers

  • Industrial plants

  • Power stations

  • Telecommunication and transmission foundations

  • Marine and port structures

From concept and building design to project and construction management, our flexible, multi-skilled team provides comprehensive, innovative, forward-thinking solutions. And as your construction partner, our services can even extend to helping you acquire and develop land to deliver one streamlined package of work, eliminating the headache of extra administrative steps.